PLATFORMS 4 AND 5 |
DESCRIBE ONLINE |
There's tactile paving near the edge of each platform.
Open platform metal grid across direction board with two departure screens trolley point bin area direction board with two departure screens trolley point foot of steps to bridge |
Go up 12 then 13 steps, going northwest, there's tactile matting at the top.
pillar on platform 5, which should house assistance phone, missing at time of survey low gap through, under steps building, under steps, with blank door and defibrillator on northwest end large low box i-girder 2 boxes i-girder box with grid round bin area 3 i-girders trolley point i-girder direction board 5 i-girders i-girder, just before end of covered area name board with two posts Post |
A row of structures runs along the middle of the island. The island narrows gradually, tactile paving near both edges.
There's a temporary barrier across the northwest end, slope off end.
© 2004, Terry Robinson