PLATFORMS 1 AND 2 |
DESCRIBE ONLINE |
There are other platforms and buildings to the west of platform 1 which are not accessible to the public. The roof of platform 1 is not the same structure as for platform 2 which is part of the main station roof.
There's tactile paving near the edge of each of these platforms, though we found no tactile paving along the edges of other platforms in this station.
The platforms slope down towards a drainage channel which runs along the middle of the platform, till you reach the buildings.
There are yellow arrows painted on the platforms indicating the way to the lifts.
You can reach these platforms via the west bridge, via steps from the north subway or via lift from the south subway.
slope off end metal post with ladder There's a row of pillars along the middle of the platform station sign pillar indicating platforms 1B and 2B rail on platform 1 leading towards lift ladder stairwell to north subway metal seats between pillars leading north flower bed seats pillars billboard surrounded by seats seats flower bed seats trolley point on platform 2 information boards, departure screens girder with platforms 1A and 2A seats and pillar defibrillator on platform 1 billboards flower bed billboards vending machine flower bed seats customer service point, facing south along platform 2 blank door on platform 1 windows of cafe, both platforms |
vending machine entrance to cafe |
The cafe is called Pumpkin, the counter is at the south end.
double row of stanchions and pillars steps from west bridge leading up north |
Beyond the bridge is a fenced area followed by a private office and a double row of stanchions to the end of the platform. We don't believe customers are supposed to go north of the bridge.
© 2007, Terry Robinson