PLATFORMS 1 AND 2, SOUTHBOUND

DESCRIBE ONLINE

Overview

This island platform is divided into platform 1, WAGN southbound which lies east of platform 2, GNER southbound.

A row of stanchions supporting the overhead cables runs along platform 2, whilst a series of posts, about a metre high runs along platform 1. It appears that the latter may be used to close off this platform under some circumstances.

There is no tactile paving towards either edge of this platform.

A drainage channel runs along the platform, on platform 2, to the building. This channel resumes beyond (south of) the lift.

Note, the concrete blocks on the north section of this platform are about a foot apart, whereas they're together on the south section of this island and the whole of platforms 3 and 4.

To Reach

From the bridge, go down 3 x 13 steps, going north onto the island platform. Platform 2, GNER southbound is to your left, you're about in the middle of the platform. Note the low (two metre) head clearance towards the bottom of the first flight of steps. There is tactile paving at the top and foot of these steps.

Platforms 1 and 2, From the North

  slope off end
sign, passengers must not cross line
post on platform 1
stanchion
name sign
lamp post
2 concrete blocks
lamp post
back-to-back benches
2 concrete blocks
metre high post
lamp post
2 concrete blocks
back-to-back benches
name sign
metre high post just south of first post
lamp post beside south post
2 concrete blocks
back-to-back benches
lamp post
metre high post

The Coffee Bar

North Side

  blank door

West (platform 2) Side

  Stanchion

South Side

  ramp entrance, digital clock above

East (Platform 1) Side

  blank wall
metre high post

Continuing South, Beyond the Coffee Bar

Main building, after about 10 metres

North Side

  steps up to bridge

West (platform 2) Side

  recessed pipe
billboards
recessed pipe
rail map
billboards
metal box
blank door
billboard
brick gives way to glass outside waiting room, metal seating rail outside
door at south end of west side
billboards

South Side

  Tap

East (Platform 1) Side, Going South

  pipe
billboard
metal box
timetables
blank door
London Connections map
timetables
blank door
billboards
pipe
Station Supervisor’s office
metal box
billboard
waiting room starts, door towards north end

Continuing South, Beyond the Main Building

  metre high post, after about 15 metres

Lift building

North Side

  substantial brick pillar, each platform
window, each platform
lift, staff operated

The up and down buttons are on a panel to the left of the door, about 1.2 metres high, whilst the assistance button is on a panel to the right of the door.

West (Platform 2) Side

  billboards

South Side

  billboard

East (Platform 1) Side

  blank wall

Continuing South, Beyond the Lift Building

  drainage channel resumes
stanchion
lamp post
bench facing platform 2
metre high post
lamp post
back-to-back benches
2 concrete blocks, together
bench facing platform 2
lamp post on platform 1
name sign
metre high post
concrete blocks
lamp post with head high sign across platform
concrete blocks
bench facing platform 2
lamp post
metre high post
2 concrete blocks
bench facing platform 1
stanchion half way along bench
lamp post
name sign
signal post, on each platform
lamp post
bench facing platform 2
lamp post
bench facing platform 1
lamp post
name sign
lamp post
sign, passengers must not cross line
slope off end

Back Links

DETAILED DESCRIPTION

STEVENAGE STATION

© 2005, Terry Robinson