PLATFORM 6 |
DESCRIBE ONLINE |
From the subway, go up 13 then 10 steps, going northeast into the waiting room. The entrance door is on the opposite side of this area, about three metres to the right. You're about in the middle of the platform.
There is no significant tactile paving near the edge of the platform.
slope off end open platform, bushes with fence behind 2 seats metal stanchion for overhead cables towards right hand side, you can go either side of this seat fence retreats southwest about a metre to wall wall with billboards wall juts out round waiting room, automatic door facing northwest metal rail runs along wall below knee height gap in rail leading to automatic doors from waiting room windows automatic doors into waiting room wall retreats southwest |
door to lift, button on right with Braille marking passage from automatic door, exit from waiting room to platforms 1 - 4 box on wall |
blank wall billboards vending machine, jutting out blank door Station Manager's office end of building, there's a slight slope down for a few metres onto platform 6 |
Open platform with a gravel section to your right, with two seats on paved areas within the gravel. Beyond the gravel is a drop into a vacant track bed. The open platform extends to the slope off the end.
If you maintain the line of the wall past the lift you pass five double pillars on your right, before a second waiting room. This waiting room has a rail around the wall with gaps leading to automatic doors with one step on the northeast and southwest sides of the building.
blank |
automatic door from waiting room |
double blank door wall juts out blank door billboards blank door |
platform 6, see above |
© 2003, Terry Robinson