THE PLATFORMS |
DESCRIBE ONLINE |
This page describes three island platforms, all of which are accessed via the bridge. These are numbered 1 - 2, 3 - 4 and 5 - 6 from the south.
Platforms 1 - 2 are for the mainline (Chiltern) services with platform 1 northbound towards Aylesbury and platform 2, southbound towards Marylebone. There is tactile paving along the edge of these platforms.
Platforms 3 - 4 are the Northbound Metropolitan Line, with platform 3, normally serving trains to Watford or Amersham, whilst Platform 4 is normally for trains towards Uxbridge. There is no tactile paving along the edge of these platforms.
Platforms 5 - 6 are the Metropolitan Line southbound, towards Baker Street and beyond. There is no tactile paving along the edge of these platforms.
We'll describe each island platform from the west end.
Turn right (south) from the gates, go down five steps, going south then turn left (east) and go down 12 then 12 steps, going east onto the platform.
Go forward (east) from the gates then go down 15 then 15 steps, going east onto the platform.
Turn left (north) from the gates, go down five steps, going north then turn right (east) and go down 12 then 12 steps, going east onto the platform.
Each set of steps is divided into two sections by a central rail, keep left.
There are two rows of pillars from the foot of the steps, supporting the canopy.
barrier, at end building seat building 2 passages between platforms blank wall to stairs to bridge stairs going up west assistance box 2 pairs of pillars seats pair of pillars stairs to subway, Oyster card reader each side, dip then go down 11 then 14 steps, going east wall of building 2 x 4 seats goods lift, not for public use 2 billboards 2 x 4 seats waiting room, door on west, dip in front of door, seats to each side wall seats and lamp posts to the barrier at the end |
barrier at end seats pillars wall, stairs to bridge assistance box, door on west wall 2 rows of seats across platform building subway stairs, go down 12 then 13 steps, going east wall of building Tube map billboard 2 x 4 seats goods lift, not for public use Tube map billboard 2 x 4 seats waiting room, door on west wall lamp posts and seats to the end barrier |
end barrier |
There are many obstacles (no need to go beyond the stairs to the bridge).
building to stairs from the bridge assistance box, door on west blank door, platform 6 stairs to subway, down 12 then 13 steps, going east goods lift, not for public use 2 billboards on pillar 2 pillars 2 x 4 seats waiting room with door in west wall, dip outside door seats and lamp posts to the end barrier |
© 2008 Terry Robinson